Gillman Barracks, the former British military camp off Alexandra Road, is being redeveloped into a mostly residential estate. HDB's 28 October 2026 news release says the revised plan is expected to yield "around 7,000 homes at Gillman Barracks, of which about 5,500 are for public housing", with site works from the second half of 2027 and land preparation from 2029. HDB's reports confirm the zoning, the 40-hectare development area, the greenery and the 25 heritage buildings to be kept. HDB has not said how many homes will be private, no private site is on sale, and the housing mix and launch date are still to be shared.
This guide separates what HDB has published, what news reports add and what is still unknown, for a buyer weighing a home near Telok Blangah, Alexandra or Berlayar. Desk research, not property, legal or financial advice.
At a glance
- Zoning: the site was rezoned for primarily residential use, subject to detailed planning, under Master Plan 2025, after the Ministry of National Development (MND) announced it for redevelopment in March 2024, says HDB's feedback summary report (p. 2).
- Size: a development area of about 40 hectares bounded by Depot Road, Alexandra Road, Telok Blangah Road/West Coast Highway and Telok Blangah Street 31, according to the environmental impact assessment summary.
- Homes: around 7,000, of which about 5,500 for public housing, HDB's release says; these are "estimates based on broad planning assumptions".
- Greenery: about 12 ha set aside in the revised plan, approximately 60% of the site's 20 ha of existing greenery, up from about 8 ha (40%) in July.
- Heritage: all four buildings of "Exceptional" and 21 of 27 of "High" heritage significance to be kept, in clusters along Preston Road, Lock Road and Malan Road.
- Timing: site works from the second half of 2027, starting with demolition, and land preparation from 2029, HDB says.
- For sale now: nothing. URA's current Government Land Sales (GLS) table, last updated 26 November 2026, lists no Gillman Barracks site.
What is planned at Gillman Barracks?
HDB's feedback summary report, published with the revised plan, says MND identified the site in March 2024 "to help meet rising housing demand and better serve existing and future communities in Bukit Merah". It was rezoned under Master Plan 2025 for primarily residential use, subject to detailed planning (p. 2). An environmental impact assessment (EIA) and a heritage impact assessment (HIA) were commissioned in 2024 and published for feedback from 10 July to 6 August 2026 (pp. 3, 8 and 9).
The HIA, a consultant's report for HDB (main report, Version 2, October 2026), says the site "will feature both public and private housing, as well as a range of public amenities" (p. 150), and that future plans "may include a mix of high-rise public and private housing developments and lower-rise amenities" (p. 155). HDB's report concludes that "it is still necessary to develop Gillman Barracks to meet housing needs in the area" (p. 13), as nearer-term supply "alongside Berlayar estate" (p. 45), which it says has been progressively launched for housing from October 2025 (p. 3).
How many homes, and how many private?
HDB's release puts the two revised sites at "about 11,000 homes over the next decade": "around 4,000 public housing units at Maju Forest and around 7,000 homes at Gillman Barracks, of which about 5,500 are for public housing". It adds: "These are estimates based on broad planning assumptions and will need to be further studied at the detailed design stage." HDB plans to use the smaller development area efficiently, "such as by building taller blocks", and says "more details on the development plans, including housing mix and launch date, will be shared when ready".
The release does not say what the other Gillman Barracks homes will be. The HIA quoted above expects both public and private housing, and The Straits Times reported on 28 October 2026 that "the remainder will be private housing". Until HDB or URA publishes a split, treat any private home count as unconfirmed. CNA reported on 28 October 2026 that Minister of State for National Development Alvin Tan said the revision meant about 800 fewer units at Gillman Barracks than the initial plans; HDB's release gives no figure for the reduction.
When could work start, and when could homes launch?
HDB's release says: "Site works are expected to start from the second half of 2027 at Gillman Barracks, beginning with the demolition of buildings on the site, followed by land preparation works which are expected to commence in 2029." It adds that "development will take several years, as infrastructure and site preparation works must be carried out before the homes and supporting amenities can be built". No launch year has been given for any public or private homes.
Two dated details are in HDB's feedback report (p. 28). The State properties at 1 to 16 Preston Road are let for residential use on an interim basis, with tenancies "expiring on varying dates in 2027". The heavy vehicle park on the site will be relocated, with drivers told before it closes.
What stays: greenery and heritage buildings
The revised plan widens the retained forest around the hillock facing Telok Blangah Street 31 and provides a continuous green area 80 m to 250 m wide along Lock Road and Malan Road, HDB's report says (pp. 13 and 14), and the retained area will join the upcoming Alexandra Nature Park. The National Parks Board (NParks) lists Alexandra Nature Park as an upcoming part of the Labrador Nature Park Network (page last updated 9 October 2026).
HDB's report says the 25 retained buildings "can be repurposed for commercial uses and amenities" (p. 14). The HIA's own table of possible new uses (p. 152) lists private housing, service apartments and co-living for the 1930s houses on Preston Road; that is a consultant's suggestion, not a decision.

How will residents get around?
HDB's report says the site is close to Labrador Park and Telok Blangah MRT stations, and to bus stops on Telok Blangah Road and Alexandra Road (p. 41). Agencies "will explore" links to existing overhead bridges and sheltered walkways to the stations, and walking trails to Labrador Park station where feasible (pp. 15 and 41). A traffic impact assessment will be carried out as part of the development process to work out the road improvements needed, such as new roads. On our reading, none of these links is committed yet.
How would the private homes be sold?
Neither HDB's release nor its reports say. URA's land sales procedure page (last updated 25 June 2026) explains that each GLS programme is planned and announced every six months, with Confirmed List sites launched at pre-determined dates, mostly by tender, and a Reserve List site put up for tender when a developer has indicated a minimum price the government accepts. URA's current GLS sites table lists no Gillman Barracks parcel on either list as of 26 November 2026. On our reading, a private site here would most likely appear in a future GLS programme first, and only then could a developer price and launch a project; that is our inference, not something URA or HDB has said about this site.
The nearest private supply on that table today is Berlayar Close, a 2.82 ha Confirmed List site with an estimated launch date of December 2026; our guide to Berlayar Drive and Berlayar Close covers it, and the GLS tender calendar tracks the rest. HDB's report adds that the Greater Southern Waterfront can be redeveloped for housing only after works such as reclamation that "will take at least 10 years" (p. 11).
What about Maju Forest at Sunset Way?
The same release covered Maju Forest in Clementi. HDB's Sunset Way feedback report expands the retained area from about 8 ha to about 10 ha, about 45% of the study area, to be safeguarded as a nature park. HDB's release counts "around 4,000 public housing units" there, with land preparation from the first half of 2028 and public access restricted once works begin. It gives no private housing figure for Maju Forest.
Worked example: reading the numbers
Our arithmetic on HDB's rounded figures, as an illustration:
- Public share: about 5,500 of around 7,000 Gillman Barracks homes is roughly 79%.
- Both sites: around 4,000 at Maju Forest plus around 7,000 at Gillman Barracks matches HDB's total of about 11,000.
- Greenery: 8 ha to 12 ha is 4 ha more, a 50% increase; 12 ha of 20 ha of existing greenery is HDB's "approximately 60%".
Now an invented household, the Lims, buying a resale condo near Telok Blangah Street 31 in 2027 and planning to stay until at least 2032. On HDB's stated timeline, demolition nearby could begin in their first year and land preparation in their third; HDB has not said when building works start or end. Their question is not "when will Gillman launch" but "what will I hear and see from my block".
Checklist for buyers looking near the site
- Check the zoning of the parcel next to the block you are viewing on URA's Master Plan; our Master Plan guide shows how.
- Walk the boundary roads (Depot Road, Alexandra Road, Telok Blangah Street 31, Telok Blangah Road) at the hours you would be home, using our neighbourhood walk.
- Time your real journey to Labrador Park or Telok Blangah station with the commute test, not a future link.
- Watch URA's GLS announcements for a Gillman parcel before treating any "upcoming Gillman condo" claim as fact.
More guides on area plans and sites are under Start your research.
Common questions
Will Gillman Barracks have private condos?
HDB's heritage report says the estate will feature both public and private housing, but HDB's 28 October 2026 release gives only a public figure (about 5,500 of around 7,000 homes), and no private site has been offered for sale yet.
When will Gillman Barracks housing be launched?
No launch date has been announced; HDB expects site works to start with demolition from the second half of 2027 and land preparation from 2029, and says the housing mix and launch date will be shared when ready.
Is Gillman Barracks on URA's Government Land Sales list?
Not as of 26 November 2026; URA's current GLS sites table lists no Gillman Barracks parcel on the Confirmed or Reserve List.
Which heritage buildings will be kept?
HDB's revised plan keeps all four buildings of "Exceptional" and 21 of 27 of "High" heritage significance, in clusters along Preston Road, Lock Road and Malan Road.
Sources
- 28 October 2026 news release hdb.gov.sg
- feedback summary report hdb.gov.sg
- environmental impact assessment summary hdb.gov.sg
- main report hdb.gov.sg
- The Straits Times straitstimes.com
- CNA channelnewsasia.com
- Labrador Nature Park Network nparks.gov.sg
- land sales procedure page ura.gov.sg
- current GLS sites table ura.gov.sg
- Sunset Way feedback report hdb.gov.sg
Something changed or worth adding?
Send a correction or suggestion