To find out whether URA has proposed or approved a zoning or plot-ratio change near a new launch, search the roads around the site on URA’s two lists of Master Plan 2025 amendments: the proposed list (last updated 16 November 2026, ten entries when we read it on 23 November) and the approved list (last updated 17 November 2026, no entries that day). On URA’s page, proposals go to the Minister for National Development for approval, after which the amendments are incorporated into the Master Plan. No entry we read gives a building height or a start date.
A walk around the neighbourhood, as our guide to questions beyond the showflat suggests, cannot show this. Below are the dated facts, one real entry read line by line, five official look-ups and a template for your research file. Two lessons from rechecking: a notice leaves the proposed list once it is no longer exhibited, and an amendment that left it can reappear weeks later on the approved list, so save a copy of any entry that matters to you.
At a glance
- Proposed list (URA, last updated 16 November 2026): ten entries under three notice dates: 30 October, 13 November and 16 November 2026. The 9 and 23 October notices have left it.
- Approved list (URA, last updated 17 November 2026): no entries. The page says: "There are currently no notices of approved amendments to the Master Plan 2025." The 30 October notice, whose inspection period ended on 14 November, has left it, as the 16 October notice did before it.
- New notices: a proposed notice dated Friday 13 November 2026 added three entries (Upper Circular Road, Sembawang Neighbourhood 4 and Seletar West Road 1), and one dated Monday 16 November 2026 added a fourth, land south of Tengeh Reservoir. Neither list carried a notice dated 20 November when we read them on 23 November.
- Objection windows printed on the proposed notices: 30 October to 28 November 2026, 13 November to 12 December 2026 and 16 November to 30 November 2026, all open on 23 November. The 9 and 23 October notices’ windows closed on 7 and 6 November, the 2 October notice’s on 31 October and the 25 September notice’s on 24 October.
- Legal requisition: S$54.50 including 9% GST, replies generally within three working days after payment (URA FAQ, last updated 10 September 2026).
- Not announced on the pages we read: when any proposal still on the list will be decided. URA cautions that actual development parameters such as building height are subject to other considerations.
What is on URA’s proposed list on 23 November 2026?
Each entry gives URA’s “from” and “to” wording. GPR means gross plot ratio. The multipliers are our arithmetic: new ratio divided by old. We count rows on URA’s list, not the notices’ amendment lines.
Three entries change a plot ratio within the same use:
- 30 October, Ang Mo Kio Street 82: ‘Residential’ at GPR 3.5 to ‘Residential at GPR 4.4’ (≈ 1.26); URA adds: “The proposed high density residential development will support the demand for housing in the area”.
- 13 November, Sembawang Neighbourhood 4 (land bounded by Admiralty Road West, Canberra Road and Sembawang Road): ‘Residential at GPR 3.5’ to ‘Residential at GPR 4.4’ (≈ 1.26), with other parcels moved between ‘Residential’, ‘Road’, ‘Place of Worship’, ‘Park’ and ‘Waterbody’, “to facilitate upcoming residential developments with complementary amenities, including a neighbourhood park and a place of worship, as announced by HDB in October 2024”.
- 13 November, Seletar West Road 1: ‘Business 2 at GPR 1.5’ to ‘Business 2 at GPR 2.5’ (≈ 1.67), “to facilitate the intensification of the site for industrial use”.
Seven change what the land is for, five of them in the 30 October notice:
- 30 October, Outram Road / Zion Road: ‘Business 1 at GPR 3.1’ to ‘Residential with Commercial at 1st Storey at GPR 4.9’, “to facilitate a development proposal received by URA”. The notice also moves some land between ‘Waterbody’ and the new zone, and rezones a ‘Residential’ lot at Zion Road at a plot ratio of 2.1 to the same 4.9 zone.
- 30 October, 28 Carpenter Street and 211 New Bridge Road (two entries): ‘Commercial’ to ‘Hotel’, each to facilitate a development proposal received by URA; at Carpenter Street the list keeps GPR 4.2.
- 30 October, 151 Lorong Chuan: ‘Business 1 at GPR 2.5’ to ‘Business 1-White at GPR 2.5’, for a proposal that “supports the injection of jobs and commercial amenities”; the notice says a plot ratio of 2.4 must be achieved for Business 1 uses before White uses are allowed.
- 30 October, 37 Changi South Avenue 2: ‘Business 2’ to ‘Civic & Community Institution’, “to support a development proposal received by URA”.
- 13 November, Upper Circular Road: ‘Commercial at GPR 4.2’ to ‘Hotel at GPR 4.2’, “to facilitate a development proposal received by URA”.
- 16 November, south of Tengeh Reservoir: ‘Reserve Site’ to ‘Utility’, “to facilitate the deployment of a Battery Energy Storage System to support the expansion of the existing floating photovoltaic system at Tengeh Reservoir”.
URA’s text names no private-housing project, and we have not matched any entry to a launch’s address. If a road name here matches your shortlisted project’s, ask URA or your lawyer what it means for you.
Where did the earlier notices go?
On 3 October 2026 the proposed list held 11 entries, including notices of 4 and 18 September for South Bridge Road and North Canal Road, Upper Changi Road East and Simei Road / Simei Lane, whose objection windows ended on 3 and 2 October. On 17 October neither notice was listed, both notice pages returned “Page not found”, and neither appeared on the approved list. URA describes the proposed list as the sites “currently exhibited”, and dropping off it turned out not to be a decision either way: on 30 October the same place names appeared on URA’s approved notice of that date, which has since left the approved list in turn. It records South Bridge Road and North Canal Road rezoned from Commercial at a plot ratio of 4.2 to Hotel at a maximum of 4.2 (approved on 12 October 2026), and plot ratio increases from 2.1 to a maximum of 3.5 on lots at Upper Changi Road East and to 3.4 at Simei Road / Simei Lane (approved on 13 October 2026). URA does not link the approved entries to the proposals; matching them by place name is our reading. For at least the two weeks between our 17 October check and 30 October, neither list showed them.
The 25 September notice (Kim Chuan Lane, Kim Chuan Drive, Tengah Central / Tengah Drive and Jurong West Street 42), whose window closed on 24 October, had left the proposed list by 2 November, its notice page returned “Page not found”, and none of its entries was on the approved list. The 2 October notice went the same way. Its two entries, Brickland Close (‘Commercial & Residential at GPR 3.0’ to ‘Commercial & Residential at GPR 4.0’, and ‘Road’, ≈ 1.33, with a reason that includes “the site’s proximity to an upcoming MRT station”) and Tomlinson Road/Orchard Boulevard (‘Residential at GPR 2.8’ to ‘Residential at GPR 3.5’, and part to ‘Road’), were on the proposed list on 2 November. Its window closed on 31 October; by 9 November it had left the list, its notice page returned “Page not found”, and neither place was on the approved list. Our Tengah rezoning note looks at the Brickland Close entry and the Tengah Central one in more detail.
The 9 and 23 October notices followed. On 9 November the proposed list still held the 9 October entry for Changi South Street 1 (‘Business 2 at GPR 1.0’ to ‘Business 2 at GPR 1.4’, for industrial intensification) and the 23 October entries for Upper Changi Road / Upper Changi Link (‘Residential at GPR 2.1’ to ‘Residential at GPR 3.5’, citing “proximity to MRT infrastructure”), Boon Lay Drive (‘Residential at GPR 2.8’ to ‘Residential at GPR 3.2’, near the upcoming Jurong Region Line stations JS6 and JS7) and Slim Barracks Rise / Nepal Park (‘White’ and ‘Commercial’ land to residential zones, to “facilitate future residential developments in One-North”). Their windows closed on 7 and 6 November; by 16 November both notices had left the list, both notice pages returned “Page not found”, and none of the places was on the approved list. Hence the saved copy in the template below.
What does the approved list show?
The approved list had no entries when we read it on 3 October 2026, five by 16 October, nine on 2 November and eight on 9 and 16 November, when it was still last updated 2 November. On 23 November it had none (last updated 17 November 2026). The 9 October notice (two Hongkong Street entries, Leonie Hill, and Ayer Rajah Avenue / Ayer Rajah Crescent / North Buona Vista Road) has left it, and its notice page now returns “Page not found”, so our reading is that the approved list, too, shows only recent notices. The 16 October notice has now gone the same way: by 9 November it had left the list and its page returned “Page not found”. It approved Tyersall Avenue / Holland Road, from Special Use and Open Space to Residential at a maximum plot ratio of 1.4, Residential (Landed), Open Space and Road (approved on 9 October 2026; inspection period 16 to 31 October), which our Tyersall Avenue note covers. Each notice gives a period when certified copies can be inspected at the URA Centre. The one notice listed on 16 November, which had left the list by 23 November (its page now returns “Page not found”):
- 30 October 2026: eight places. Raffles Boulevard, a Hotel plot ratio amendment and part rezoned to Residential with Commercial at 1st Storey (approved on 28 July 2026); Bedok Avenue, designated a Conservation Area (21 October); South Bridge Road and North Canal Road, Commercial to Hotel at a maximum plot ratio of 4.2 (12 October); Simei Avenue, Transport Facilities and Road land moved to Health & Medical Care, Road and Transport Facilities (29 September); Upper Changi Road East / Upper Changi Road and Upper Changi Road East / Upper Changi Link / Upper Changi Road, Residential from a plot ratio of 2.1 to a maximum of 3.5, with some land to Open Space, Park and Road (13 October); and Simei Road / Simei Lane, Residential from 2.1 to a maximum of 3.4, with part to Road (13 October). Inspection period: 30 October to 14 November 2026, now ended.
Each approved notice says the amendments “shall take effect on the dates set out above”, the approval dates. Four of the places on the 30 October notice were on the proposed list we read on 3 October, but the five approvals listed by 16 October were not, and URA does not cross-reference the two lists, so search both rather than expecting to follow one amendment from one to the other.
How do you read “Residential at GPR 2.8 to Residential at GPR 3.5”?
URA’s gross floor area handbook (last updated 6 November 2026) defines gross plot ratio as “the ratio of the GFA of a building to its site or plot area”, and says a development’s allowable GPR is guided by the GPR in the Master Plan. Read the Tomlinson Road/Orchard Boulevard entry from the 2 October notice one line at a time, as we read it on 2 November 2026 (the notice has since left the list and its page returns “Page not found”):
- Where: the list says “land parcels at the junction of Tomlinson Road and Orchard Boulevard”; the notice itself says “at Tomlinson Road”.
- From and to: ‘Residential at GPR 2.8’ to ‘Residential at GPR 3.5’, which the notice calls a “maximum permissible plot ratio of 3.5 (gross)”.
- The arithmetic: 3.5 ÷ 2.8 = 1.25. The floor area the plan allows on each square metre of land rises by a quarter.
- An illustrative example: on a fictional 10,000 m² plot, 2.8 allows up to 28,000 m² of gross floor area and 3.5 allows up to 35,000 m², or 7,000 m² more.
- What it does not say: height, the number or size of homes, a start date, whether the proposal will be approved, or whether anyone intends to build.
Brickland Close reads the same way: 4.0 ÷ 3.0 ≈ 1.33, a third more floor area per square metre of land. We could not open the Master Plan’s Written Statement, so read no more into a zone label such as ‘Commercial & Residential’ than the notice’s own words. Both entries also move part of the land to ‘Road’. Each notice links a PDF for every amendment; those PDFs did not open on our network, so we cannot say which part of either site is affected.
What are the five look-ups, in order?
The order is ours, not URA’s.
- The Master Plan itself. URA’s Master Plan page (last updated 17 June 2026) says the plan “shows the permissible land use and density for developments in Singapore”, is reviewed every five years and is viewable on URA SPACE. Note the zoning and plot ratio shown for the project’s plot and the plots beside it, with the date you looked.
- The proposed list. Search the road names around the site, then open each matching notice for its printed dates, and save a copy while it is listed.
- The approved list. It showed no approved amendments when we read it on 3 October 2026, five on 17 and 26 October, nine on 2 November, eight on 9 and 16 November and none on 23 November. Recheck it whenever you recheck the proposed list.
- A legal requisition, through your lawyer. URA’s FAQ says any member of the public may apply, but “in most cases” law firms submit them for property transactions. It returns the latest planning decision, any refusal and its grounds, and the current Master Plan zoning for a property. It does not cover land acquisition, road proposals or drainage proposals; the FAQ points to the Singapore Land Authority, the Land Transport Authority and PUB for those. We found no mention of proposed Master Plan amendments in the FAQ, so do not assume a requisition reports them; ask your lawyer.
- Approved plans, DC15. URA’s buying-property guidance (last updated 6 November 2026) says that when buying a private residential property you can ask the seller for a copy of the approved plans or submit DC15 (Requisition of Planning Records) to URA. The DC15 FAQ (last updated 15 October 2026) gives a search fee of S$109.00 including 9% GST plus document fees, and says URA will email you once the search results are ready, within 10 working days. It asks for documentary proof of ownership, plus either the written consent of the person who engaged the architect or professional engineer (and of that professional) or a letter of authorisation from the owner. Our reading, not URA’s: neither page says whether a DC15 search applies to an uncompleted unit, so ask your lawyer.
What do the dates on the notices mean?
Each proposed notice says a certified copy of the proposals may be inspected during office hours at the URA Centre, 45 Maxwell Road, and that any objection or representation may be sent in writing to the Permanent Secretary, Ministry of National Development, on or before the printed date, stating the grounds on which it is made (Rule 5 of the Planning (Master Plan) Rules). The 30 October and 13 November notices run to a date 29 days after the notice (our count from the printed dates): 28 November and 12 December 2026, as did the 25 September, 2 October and 9 October notices (24 October, 31 October and 7 November). The 23 October notice was shorter: it ran to 6 November 2026, 14 days after the notice, and so does the 16 November notice, which runs to 30 November 2026, so read the printed date rather than assuming a fixed length.
A closed window is not a decision, and we found no decision date on the pages we read. Every notice date we saw until mid-November, proposed or approved, was a Friday (4, 18 and 25 September, 2, 9, 16, 23 and 30 October and 13 November 2026), but the proposed notice of 16 November 2026 is dated a Monday, so that pattern was an observation, not a URA schedule. Friday 6 November brought no new notice on either list, Friday 13 November one proposed notice and Friday 20 November none: when we read them on 23 November, the proposed list said it was last updated on 16 November and the now empty approved list on 17 November. Whether to send a representation is your own choice; this page does not advise on it.
What can the lists not tell you?
- Height and timing. URA cautions that actual development parameters such as building height are subject to other considerations, and the entries we read give no height or start date.
- Floor area actually built. URA’s gross floor area handbook allows bonus GFA above the Master Plan ratio, up to a maximum of 10% of it, under incentive schemes. Our reading: the ratio in an entry is a planning parameter, not a forecast of what will be built.
- Names. Entries are listed by road. Our inference: a plot beside your project may sit under a neighbouring road name, so also look at the plan in URA SPACE, not only the list.
- Land sales. A Master Plan amendment is not a land sale: URA’s open tenders and their closing dates are in our GLS tender calendar.
A template for your research file
File each entry as a dated document, with the notice’s printed date as the document date:
- Notice date and link: as printed, with a saved copy of the notice page, since URA takes a notice off the proposed list once it is no longer exhibited.
- Location: road names exactly as URA wrote them.
- From and to: URA’s wording in quotation marks, and the multiplier (new ÷ old) or “not a ratio change”.
- URA’s stated reason: quoted, or “none given”.
- Window closes and status: the printed date; proposed or approved, and the date you checked.
- Your own note: where it sits relative to your shortlisted project, labelled as your observation.
- Question for your lawyer: if any.
What should you check before you book?
- List the road names around your shortlisted site, search both lists for each, and write “none found on [date]” if nothing matches. That is a result too, with the limits above.
- Ask your lawyer which searches will be made, including a legal requisition, and what each does not cover.
- Keep what you saw on foot separate: our commute test and the viewing guides cover that side.
- Recheck both lists the day before you pay a booking fee.
Common questions
Does a proposed amendment mean a building will go up next to a condo?
No. A proposal changes what the Master Plan would allow once approved. URA cautions that actual parameters such as building height are subject to other considerations, and no entry we read gives a start date.
What is a legal requisition and what does it cost?
It is a URA search giving the latest planning decision and current Master Plan zoning for a property. The fee is S$54.50 including 9% GST, replies are generally issued within three working days after payment, and it does not cover land acquisition, road proposals or drainage proposals.
What does a change from GPR 2.8 to GPR 3.5 mean?
Plot ratio is floor area relative to land area, so 3.5 ÷ 2.8 = 1.25 means a quarter more floor area per square metre of land. It is a proposal, and it says nothing about height, timing or approval.
Sources
- proposed list ura.gov.sg
- approved list ura.gov.sg
- 30 October ura.gov.sg
- 13 November ura.gov.sg
- 16 November ura.gov.sg
- URA FAQ ura.gov.sg
- gross floor area handbook ura.gov.sg
- URA’s Master Plan page ura.gov.sg
- buying-property guidance ura.gov.sg
- DC15 FAQ ura.gov.sg
Something changed or worth adding?
Send a correction or suggestion