A bomb shelter in a Singapore home is a household shelter (HS): a small room with thickened concrete walls, floor and ceiling and a steel door, required in new homes by the Civil Defence Shelter Act. For a new-launch buyer it matters three ways: it sits inside the floor area you pay for, it carries renovation rules that bind every owner, and some blocks have a shared storey shelter instead. Here is what SCDF's, BCA's and URA's pages said on Sunday 29 November 2026, and what to check before booking and at key collection.
Desk research on official pages, not legal or renovation advice.
At a glance
- Required by law: under section 3 of the Civil Defence Shelter Act 1997, every new flat needs a household shelter, unless its storey has at least one storey shelter instead.
- What it is for: protection "against weapon effects during a National Emergency". SCDF's technical requirements add that it "should not be used for protection during other emergency situations such as a fire in a building".
- Size: for a home of more than 75 and up to 140 sqm of gross floor area, the minimum is 2.8 sqm of internal floor area and 7.2 cubic metres.
- Renovation: no hacking, no tiles or plaster on the inside walls and no changes to the door; drilling into the inside walls and ceiling is allowed only to a depth of 50 mm, for inserts and removable screws, per SCDF's permitted and not permitted works list.
- Penalty: under section 4, an owner or occupier who does work likely to damage or impair the shelter without the written permission of the Commissioner of Civil Defence, or fails to maintain it as required, can be fined up to S$5,000 and, for a continuing offence, up to S$250 for every day it continues after conviction.
- Dated change: a notice on SCDF's pages reads: "With effect from 21 Dec 2026, the SCDF Hotline (1800 280 0000) will cease operations."
Why does a new condo have a bomb shelter?
Under the 1997 Act, "new houses and flats must have household / storey shelters incorporated into the development", so planning applications to URA must include them, says SCDF's civil defence shelter page (last updated 18 November 2026). The Act took effect on 1 May 1998, apart from its emergency-only parts. The page describes walls, floor and ceiling "strengthened with increased thickness", two ventilation sleeve openings and an SCDF-approved steel door whose inside notice "states clearly the prohibited works within it". The owner "is not allowed to tamper with" the door, walls, floor or ceiling, and must keep the door and ventilation sleeves working.
BCA approves shelter plans and commissions completed shelters; SCDF handles waivers and inspections, says SCDF's page on regulating shelters. BCA's household and storey shelters page (last updated 16 March 2026) lists developments that need no shelter, among them hotels, serviced apartments, staff quarters and dormitories.
Household shelter or storey shelter: which will your unit have?
The Act lets a block of flats have, storey by storey, a household shelter in every flat or, "in lieu", at least one storey shelter for "the occupants of, and of persons ordinarily frequenting, the flats on that storey". A unit on a storey-shelter floor has no shelter room of its own.
Our reading: a room marked HS on the unit's floor plan is a household shelter; a shelter drawn in the common area of the storey plan points to a storey shelter. Ask the sales team which applies to your stack. SCDF's guide for owners and managing corporations covers both; how a development manages a shared storey shelter is a question for the developer and, after handover, the MCST.
How big must a household shelter be?
Clause 2.2 of SCDF's Technical Requirements for Household Shelters 2023 (last updated 9 October 2026) ties the minimum size of a rectangular or square shelter to the gross floor area (GFA) of the home:
- GFA up to 40 sqm: 1.44 sqm of floor area and 3.6 cubic metres.
- More than 40 and up to 45 sqm: 1.6 sqm and 3.6 cubic metres.
- More than 45 and up to 75 sqm: 2.2 sqm and 5.4 cubic metres.
- More than 75 and up to 140 sqm: 2.8 sqm and 7.2 cubic metres.
- More than 140 sqm: 3.4 sqm and 9.0 cubic metres.
Divided by the floor area, those volumes imply a clear height of 2.50, 2.25, 2.46 (rounded up), 2.58 (rounded up) and 2.65 (rounded up) metres band by band (our arithmetic); in the second band that is below the 2.4-metre minimum, so the minimum height governs there. The internal floor area may not exceed 4.8 sqm unless the relevant authority approves more, the clear height is 2.4 to 3.9 metres, the internal width at least 1.2 metres and the internal length at most 4 metres. Under clause 2.5, the door opening is 700 mm wide and 1,900 mm high, and the door must be able to open at least 90 degrees.
URA's GFA handbook entry (last updated 6 June 2026) says: "Household shelters are included as GFA." Our reading: the shelter is part of the space your home is measured on, not a bonus. Our floor plan guide explains strata area; confirm with the developer that the HS lies within your unit's stated strata area.
Worked example: two invented units
Illustrative figures of our own, not any real project.
- Unit A, a two-bedroom of 70 sqm GFA: at least 2.2 sqm and 5.4 cubic metres. At the lowest clear height, 2.2 x 2.4 = 5.28 cubic metres, short of 5.4, so a 2.2 sqm shelter needs a clear height of at least 5.4 / 2.2 = 2.46 metres (rounded up), or more floor area.
- Unit B, a three-bedroom of 100 sqm GFA (the size SCDF's own illustration uses): at least 2.8 sqm and 7.2 cubic metres, so at exactly 2.8 sqm the clear height must be at least 7.2 / 2.8 = 2.58 metres (rounded up).
- Share of the home: at the minimums, 2.2 / 70 = 3.1% of Unit A and 2.8 / 100 = 2.8% of Unit B. 2.8 sqm is about 30.1 sq ft (2.8 x 10.764 = 30.14; see our sqm to sq ft converter).
Area and volume set the minimum together, and a shelter may exceed it, so ask for the HS's internal dimensions rather than assuming the table figure.
What can you change in the shelter when you renovate?
SCDF's permitted works list and clause 7.2 of the technical requirements (last updated 16 March 2025) draw the line. Allowed:
- Floor tiles bonded to wet cement mortar, with total finishes and screed no thicker than 50 mm; vinyl or linoleum flooring; skirting tiles up to 100 mm high on wet mortar.
- Painting walls, ceiling and door, but not over the door notice, locking bolts or door seal.
- Drilling into the internal walls and ceiling no deeper than 50 mm for inserts and removable screws; fixtures such as pictures, posters, cabinets or shelves on the internal walls "will have to be removed by the owners within 48 hours upon notification". The non-metallic insert may be any diameter as long as it is no more than 50 mm long.
- Splatter dash or equivalent on the external face of the shelter walls only, as a rough surface for feature wall panels or wall tiles.
- Power-driven nails "only on external face of the HS walls". SCDF's PDF list (item 2(h)) adds: "The length of power driven nail shall not be more than 75mm." The online clause 7.2.1(h) states no length.
- Painting only the exterior face of the ventilation sleeves' 6 mm fragmentation plates; removing those plates is allowed if the plates and their bolts and nuts are kept or mounted together for use when needed.
- Covering the ventilation openings with removable finishes, as long as at least 25% of the total area of the two openings stays uncovered for ventilation in peacetime.
Not allowed: wall tiles, plaster or sprayed finishes on the internal walls; floor tiles laid with adhesive; a second layer of tiles; cornices; power-driven nails into the internal walls; tampering with or covering the door notice; any other hacking or drilling; hacking either face of the walls to form a key for tiling, or the external face to mount feature wall panels or wall tiles; modifying the door (the PDF says "door and frame"); tampering with the ventilation openings, plates, bolts and nuts; and painting the interior face of the fragmentation plates, the sleeves, their rubber gaskets or bolts. Clause 2.7 adds that light fittings go on the ceiling with screws in non-metallic inserts, wall-mounted lights are not permitted, and cabinets and shelves are allowed "provided they are easily dismantled and removed".
Our reading: a wardrobe that cannot be easily removed, tiled walls inside or a replacement door to match the home are out. Put the shelter rules in your contractor's scope (renovation contractor guide); for the rest of the unit, see what URA lets you change.

Can you use the shelter as a storeroom or study?
Section 12 of the Act allows peacetime uses prescribed by regulations, approved by SCDF in writing or allowed under other written law, and bars changing a shelter's use without the Commissioner of Civil Defence's prior written approval (a fine of up to S$10,000 and, for a continuing offence, up to S$500 for every day it continues after conviction). SCDF's clause 1.3 says every HS "shall be designed to a specific peacetime use".
We did not open the regulations that prescribe uses, so we cannot say whether storage is one of them. Our suggestion: ask the developer what peacetime use the approved plans give the room and keep the answer in writing.
What should you check, from sales gallery to keys?
Our checklist, built from the SCDF documents above:
- Type: is there an HS inside the unit, or a storey shelter on the floor?
- Size and area: ask for the HS's internal dimensions and confirm it lies within the stated strata area.
- Use: ask which peacetime use the approved plans give it, and plan furniture so the door can still swing open 90 degrees.
- At key collection: door notice on the inside face; door opens and closes without scraping; handle swings down to open and lifts into what SCDF's guide calls Civil Defence mode; rubber gaskets intact; ventilation plates and screws in place.
- Serial label: SCDF's guide places it on the hinge-side edge of the door, checkable in the certification body's online directory.
- Record it: note any fault in your defects log and on your key collection walkthrough; more checks for viewings and handover are in our viewings guides.
You cannot repeat the commissioning tests: under clause 6.5, a shelter is commissioned only after passing light penetration, door-seal chalk mark and air-tightness tests in one inspection. Our suggestion: ask the developer to confirm your shelter was commissioned.
Who do you ask, and what changes on 21 December?
Section 4's written permission comes from the Commissioner of Civil Defence. SCDF's acts and requirements page (last updated 11 November 2026) lists the technical requirements and a separate storey shelter works list. The regulating page still names the 1800 280 0000 hotline for booking shelter consultations, but a notice on SCDF's pages on 29 November 2026 reads: "With effect from 21 Dec 2026, the SCDF Hotline (1800 280 0000) will cease operations. For emergencies, please call 995 or SMS to 70995. For non-emergencies, please contact us via the SCDF Feedback Form." Our suggestion: ask in writing before a contractor touches the shelter.
Common questions
Is a bomb shelter compulsory in a new condo in Singapore?
Yes; under the Civil Defence Shelter Act every new flat needs a household shelter unless the building provides at least one storey shelter on that storey instead.
Can I hack or tile the walls of my household shelter?
No; SCDF's list bars hacking, wall tiles and plaster on the inside walls, and allows drilling into the inside walls and ceiling only to a depth of 50 mm for inserts and removable screws.
How big is a household shelter in a condo?
It depends on the home's gross floor area; for more than 75 and up to 140 sqm the minimum is 2.8 sqm of internal floor area and 7.2 cubic metres, and the maximum floor area is 4.8 sqm unless the relevant authority approves more.
Does the shelter count in my unit's floor area?
URA's handbook says household shelters are included as gross floor area; confirm with the developer that the HS lies within the strata area stated for your unit.
Can I hide in the bomb shelter during a fire?
No; SCDF's technical requirements say a household shelter should not be used for protection during other emergencies such as a fire in a building.
Sources
- Civil Defence Shelter Act 1997 sso.agc.gov.sg
- technical requirements scdf.gov.sg
- permitted and not permitted works scdf.gov.sg
- civil defence shelter page scdf.gov.sg
- page on regulating shelters scdf.gov.sg
- household and storey shelters page www1.bca.gov.sg
- guide for owners and managing corporations scdf.gov.sg
- Technical Requirements for Household Shelters 2023 scdf.gov.sg
- clause 2.5 scdf.gov.sg
- GFA handbook entry ura.gov.sg
- clause 7.2 scdf.gov.sg
- Clause 2.7 scdf.gov.sg
- clause 1.3 scdf.gov.sg
- clause 6.5 scdf.gov.sg
- acts and requirements page scdf.gov.sg
- storey shelter works list scdf.gov.sg