"Long Island" is the Government's plan to reclaim about 800 hectares of land off the East Coast, potentially in the form of islands, to protect the low-lying coast from rising sea levels, add a new reservoir, create land for future needs and add around 20 kilometres of waterfront parks. On 17 November 2026 the Urban Redevelopment Authority (URA) said in a media release that preparatory works in the sea will start progressively from January 2027, west of Bedok Jetty, and that a new round of public focus groups on "Recreation" and "Connectivity" begins the same month. For a home buyer near the East Coast, the confirmed part is when and where the early works happen; the island's final shape, its uses, its links to the mainland and the start of the main reclamation are not decided.

URA's Long Island page (last updated 17 November 2026) says the project is expected to take "a few decades to plan, design and implement". Treat it as a dated planning fact in your research file, not as a selling point. General information from desk research, not financial, legal or property advice.

At a glance

  • Size and purpose: about 800 hectares, which URA says could be about two times the land area of Marina Bay; coastal protection, a new reservoir, land for future development needs and around 20 km of new waterfront parks (URA).
  • From January 2027: the first phase of preparatory works in the waters west of Bedok Jetty: about 570 hectares, around 7 km from east to west and up to 1 km wide, at least 130 m from the shoreline (URA, 30 June and 17 November 2026).
  • Second phase: about 155 hectares east of Bedok Jetty, only after the Southeast Asian (SEA) Games in 2029; URA has not given a start date.
  • Main reclamation: only after technical studies, mitigation measures and further public engagement; the studies are expected to take "the next few years".
  • East Coast Park: beaches, exercise paths and tracks stay accessible during the preparatory works, according to URA.
  • Your say: URA's focus groups start in January 2027; members of the public can register interest on URA's engagement page.

What is Long Island, and why is it being built?

Citing the 3rd National Climate Change Study, URA's page says mean sea level around Singapore could rise by up to 1.15 m by 2100, and up to 4 to 5 m when extreme high tides meet storm surges. About 30% of Singapore's land is less than five metres above mean sea level, and the low-lying East Coast has already had instances of flooding during high tides.

The land would be reclaimed to a higher level as a continuous defence, with 12 outlet drains emptying into a new reservoir with two barrages and pumping stations, working like Marina Barrage.

Agencies also studied a sea wall of up to 3 m along East Coast Park with 12 tidal gates and pumping stations, and judged it not ideal: building it would disrupt the park for long periods, and the pumping stations would take park space equal to about 15 football fields.

URA traces the idea to the 1991 Concept Plan and the 2019 National Day Rally; engagement and technical studies were announced in November 2023, and more than 15,000 people have given feedback since.

What starts in January 2027, and how close is it to the shore?

URA's release of 30 June 2026 on the preparatory works said they would start at "end-2026". The 17 November release and the Long Island page now say January 2027, so go by the later date.

The works remove obstructions from the seabed, then build temporary sand bunds and fill them with sand. The June release puts them at least 130 m from the shoreline, demarcated by silt screens and/or floating barriers, with Phase 1 covering about 570 hectares west of Bedok Jetty. Beaches stay open for near-shore swimming and all exercise paths and tracks stay accessible for jogging and cycling; sea users are asked to keep a safe distance from the vessels and the work area.

The release summarises the Environmental Study for these works: no significant change to water quality, slight localised changes to currents and waves near Bedok Jetty, "up to minor" visual and air quality impact with intermittent sediment plumes and dust, and kiteboarding as the most affected sea sport. Water quality, suspended sediment, noise and dust will be monitored throughout the works.

On land, URA's technical studies page says land-based site investigation works began at selected locations along East Coast Park in September 2026, with a few soil investigation rigs temporarily stationed there, and will continue over the next few months; the National Parks Board's East Coast Park page lists the works as running until the first quarter of 2027.

A seaside park path with joggers and trees in the foreground and, far out on a calm sea, small work vessels behind a line of floating barriers
Conceptual illustration: a coastal park with work vessels far offshore. It is not East Coast Park, the Long Island works or any real development. Illustration by Olano editorial, made with AI assistance.

What is still undecided?

Four things are not settled on any official page we read today.

  1. The final shape. URA states plainly that the preparatory works area "does not represent the eventual land profile" of Long Island. The reclamation profile is still being studied; the Housing & Development Board (HDB), the appointed reclamation agent, says on its environment page that the second-stage Environmental Study, covering the reclamation itself, is in progress.
  2. What goes on it. URA's page says new spaces "could" combine recreation, "waterfront living concepts" and nature for "homes, recreation and nature", and "build housing" appears among the public's ideas. There is no zoning, number of homes or date.
  3. How it connects. The 2027 focus groups will explore options to connect Long Island with the city, the eastern region and the rest of Singapore; no road, rail line or bridge appears on the official pages we read.
  4. When the main reclamation starts. Only after the studies, mitigation measures and further engagement; URA gives no year, and no start date for Phase 2 either.

How could Long Island matter to a home near the East Coast?

What follows is our reading of the official pages, not an agency's statement.

  • Years of works offshore. From 2027 a seafront home may look out on vessels and sand infilling at least 130 m out; the Environmental Study summarised in URA's June release expects "up to minor" visual impact from the sand infilling. Whether the home lies west or east of Bedok Jetty tells you which phase it faces: Phase 1 from January 2027, or Phase 2 after the 2029 SEA Games.
  • The view is not fixed. A view of today's open sea may one day face reclaimed land, a reservoir or new parks. Nobody can show you the final shoreline today, so treat any promise of a lasting sea view with care; our guide to checking new-launch marketing claims sets out how to ask for the source.
  • Protection takes time. URA says Long Island is needed to protect homes, businesses, infrastructure and public spaces in the low-lying East Coast, but it expects the project to take a few decades to plan, design and implement. We did not open PUB's flood pages for this guide, so if flooding matters to you, ask PUB about the specific address and ask your conveyancing lawyer which official searches they will make on it.
  • Future amenities are ideas. Parks, beaches and links on Long Island are still under study, so a brochure listing them as nearby facilities is describing a plan not yet drawn.

For other dated changes in the east, see our guides to the Bedok South MRT opening on 26 December and the East Coast Road GLS site.

Worked example: what a "sea view" premium costs today

An invented example; every name and figure is made up. A couple compare two units of the same size in a fictional condo near the coast. Unit A, on a high floor facing the sea, is priced at S$2,150,000. Unit B, facing inland, is S$2,020,000.

  1. Price premium: S$2,150,000 minus S$2,020,000 is S$130,000, or about 6.4% of Unit B's price.
  2. Buyer's Stamp Duty (BSD): under the IRAS BSD rates for residential property (last updated 9 October 2026), both prices end in the 5% band, which applies to the portion of a price between S$1.5 million and S$3 million. Unit A's BSD is S$77,100 and Unit B's is S$70,600, so the premium adds S$6,500 of duty. Our BSD and ABSD calculator shows the working; any Additional Buyer's Stamp Duty depends on the buyers and is left out here.
  3. Total extra outlay: S$136,500 before any loan interest, for a view whose long-term outlook no official page yet describes.

Unit A is not a poor choice; the couple should know which part of the premium buys something certain (height, light, layout) and which part assumes a view that may change.

A checklist before you book near the East Coast

  1. Read URA's Long Island page and note its "Last updated" date; URA says the page will carry the latest information.
  2. Look at the indicative map of the preparatory works on URA's Long Island page, then read HDB's Environmental Study (Part 1) executive summary, linked from HDB's environment page, for the expected effects of the works.
  3. Mark the home against Bedok Jetty: west means Phase 1 from January 2027, east means Phase 2 after 2029.
  4. Ask the developer or salesperson to put any Long Island claim in writing with its source and date.
  5. Check URA's amendment lists around the site, as our Master Plan 2025 amendments guide explains.
  6. Save each page, with its date, in your new launch research file.
  7. If you want a say, register for the 2027 focus groups on URA's engagement page.

More planning and land-sale explainers sit under Start your research.

Common questions

When will Long Island be finished?

URA gives no completion date; it says the project will take a few decades to plan, design and implement, and the main reclamation starts only after technical studies and more public engagement.

Will there be new homes on Long Island?

Nothing is confirmed: URA's page says new spaces could integrate waterfront living concepts to create spaces for homes, recreation and nature, but no zoning, number of homes or date appears on the official pages we read.

Will East Coast Park close during the works?

No, according to URA: during the preparatory works beaches, exercise paths and tracks stay accessible, near-shore swimming continues, and sea users are asked to keep clear of the vessels and work area.

Where exactly do the works start in January 2027?

In the waters west of Bedok Jetty, over about 570 hectares, at least 130 m from the shoreline; the 155-hectare area east of the jetty follows only after the 2029 SEA Games.